PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Front side of the Curtain Wall Mockup  (800x600).jpg Grade area at Elev. 7-Stair -4,5 Footings (800x600).jpg Job Site during Pouring of concrete Facing South-East (800x600).jpg Pouring Concrete at Elev. 5-6 Shear walls 2nd Floor Facing South (800x600).jpg Pouring Concrete at Elev. 5-6 Shear walls 2nd Floor Facing South-East (800x600).jpg Pouring Concrete at Monumental Stairs wall forms Facing South (800x600).jpg Stripped Elev. 1,2,3 Facing East(800x600).jpg
Previous pageNext page Pouring Concrete at Elev. 5-6 Shear walls 2nd Floor Facing South-East (800x600)
Pouring Concrete at Elev. 5-6 Shear walls 2nd Floor Facing South-East (800x600)